Compliance & environmental planning

Environmental impact, understood before it becomes risk.

Environmental Impact Assessment support for water-intensive industrial and infrastructure projects, grounded in baseline data, treatment feasibility and a practical compliance pathway.

Discuss your project
EIAPlanning & evidence

A more useful assessment

Connect environmental evidence to decisions.

We help project teams understand water demand, wastewater risk, likely environmental impacts and mitigation options early enough to shape a stronger project plan.

Baseline environmental review

Define the water, wastewater, air, soil, noise and community conditions that matter for the proposed site and project footprint.

Impact & mitigation planning

Translate process inputs and outputs into a risk register, mitigation measures, monitoring requirements and treatment strategy.

Water & wastewater strategy

Assess source demand, reuse potential, discharge pathways, ETP/STP/ZLD feasibility and monitoring needs alongside the wider impact assessment.

Compliance documentation

Prepare technical inputs and evidence packages that support environmental-clearance workflows, Consent to Establish/Operate and related statutory submissions.

MoEFCC & NABET Alignment

The 8-Step Environmental Clearance Workflow

End-to-end technical support for Category A and Category B industrial projects seeking Environmental Clearance (EC) from State & Central Expert Appraisal Committees.

Stage 01

Project Screening

Categorization of project under Category A (MoEFCC Delhi) or Category B1/B2 (SEIAA) based on industrial sector schedule & capacity threshold.

Stage 02

Scoping & TOR Approval

Preparation of Form-1 and Pre-Feasibility Report (PFR) to secure Terms of Reference (TOR) from Expert Appraisal Committee (EAC).

Stage 03

Baseline Environmental Data

3-Month seasonal baseline monitoring: Ambient Air (12 parameters), Surface & Ground Water quality, Soil chemistry, Day/Night noise & Ecology.

Stage 04

Impact Prediction & Modeling

AERMOD mathematical air dispersion modeling, hydrogeological drawdown analysis, and noise contour mapping for operational phase risk assessment.

Stage 05

Environmental Management Plan

Design of ETP/STP/ZLD treatment systems, greenbelt development plan (33% land area), rainwater harvesting, and occupational safety measures.

Stage 06

Public Hearing Support

Preparation of Executive Summary in English & local language, public hearing compliance matrix, and community concern response strategies.

Stage 07

EAC Presentation & Appraisal

Technical presentation before Expert Appraisal Committee (EAC/SEAC) with detailed replies to committee queries.

Stage 08

EC Grant & Compliance Monitoring

Issuance of Environmental Clearance order, CTE application filing with State Pollution Control Board, and half-yearly compliance reporting.

Start with the right evidence

Planning a project with water or environmental risk?

Bring us in before the treatment plant, filing schedule and mitigation plan are fixed.