Baseline environmental review
Define the water, wastewater, air, soil, noise and community conditions that matter for the proposed site and project footprint.
Compliance & environmental planning
Environmental Impact Assessment support for water-intensive industrial and infrastructure projects, grounded in baseline data, treatment feasibility and a practical compliance pathway.
Discuss your projectA more useful assessment
We help project teams understand water demand, wastewater risk, likely environmental impacts and mitigation options early enough to shape a stronger project plan.
Define the water, wastewater, air, soil, noise and community conditions that matter for the proposed site and project footprint.
Translate process inputs and outputs into a risk register, mitigation measures, monitoring requirements and treatment strategy.
Assess source demand, reuse potential, discharge pathways, ETP/STP/ZLD feasibility and monitoring needs alongside the wider impact assessment.
Prepare technical inputs and evidence packages that support environmental-clearance workflows, Consent to Establish/Operate and related statutory submissions.
MoEFCC & NABET Alignment
End-to-end technical support for Category A and Category B industrial projects seeking Environmental Clearance (EC) from State & Central Expert Appraisal Committees.
Categorization of project under Category A (MoEFCC Delhi) or Category B1/B2 (SEIAA) based on industrial sector schedule & capacity threshold.
Preparation of Form-1 and Pre-Feasibility Report (PFR) to secure Terms of Reference (TOR) from Expert Appraisal Committee (EAC).
3-Month seasonal baseline monitoring: Ambient Air (12 parameters), Surface & Ground Water quality, Soil chemistry, Day/Night noise & Ecology.
AERMOD mathematical air dispersion modeling, hydrogeological drawdown analysis, and noise contour mapping for operational phase risk assessment.
Design of ETP/STP/ZLD treatment systems, greenbelt development plan (33% land area), rainwater harvesting, and occupational safety measures.
Preparation of Executive Summary in English & local language, public hearing compliance matrix, and community concern response strategies.
Technical presentation before Expert Appraisal Committee (EAC/SEAC) with detailed replies to committee queries.
Issuance of Environmental Clearance order, CTE application filing with State Pollution Control Board, and half-yearly compliance reporting.
Start with the right evidence
Bring us in before the treatment plant, filing schedule and mitigation plan are fixed.